Solartron Solar Cell Factory

High-tech factory construction in the jungles of Khao Yai

Using a combination of time lapse and computer graphics animation, Living Films will create yet another promotional film for the German solar factory design masters: Centrotherm. Unlike our film covering the Ekarat factory near Pattaya, which covered the inner working of the high-tech production line, this film covers the actual construction process and building of an entire turn key factory.

The film highlights the incredible logistics involved in creating such a modern structure using footage shot over several months. The center piece of the factory is a ‘clean room' used as a dust free environment to create the solar cells. Other features include a waste water treatment system that takes up 25% of the land area of the factory just to insure environmentally friendly operations.

Previous

Next

Project Details

Client: Centrotherm, Germany
Producer: Dietmar Haack
Director: Georg Peter Mueller
Editor: Georg Peter Mueller
DOP: Vincent Reynaud

©Living Films 2007